Home Authors Posts by weldfabtechtimes

weldfabtechtimes

30 POSTS 0 COMMENTS

Mumbai Ahmedabad High Speed Rail Corridor

The project is estimated to cost ₹1.08 lakh crore (US$17 billion). The cost includes interest during construction and import duties. JICA agreed to fund...

Highest bridge of the world on river Chenab

The government is building the tallest bridge in the world over river Chenab at Doda (359 metre above the river). The bridge would be...

Inland Waterways

Modi government has planned to develop inland waterways including rivers like Ganga, Brahmaputra and Mahanadi. The government is spending around Rs 4,000 crore for...

Mumbai Trans Harbour Link, Shivaji Memorial

This will be country’s longest sea bridge at 22.5 km. It will connect Mumbai’s eastern suburbs with the mainland across the harbour through a...

Gujarat-Gorakhpur gas pipeline

Government-owned Indian Oil Corporation (IOC) is laying India’s longest LPG pipeline from Kandla coast in Gujarat to Gorakhpur in eastern Uttar Pradesh. The 1987-km...

Sigma Therm–IH :Pre-Post Weld Heat Treatment

The Sigma Therm is an inverter based preheating and post weld heat treatment unit especially for tubes and pipes. Depending on the size of...

Rilox Arc 200

Rilox Arc has always been one of the most sold products in the market. We have selected each and every components of this product...

Pro-Arc Welding & Cutting Systems

  Being the market leader in India for CNC Thermal Cutting Machines, Pro-Arc has always been the first class indigenous manufacturer of the below...

Cladding Systems

Cap Seal / Shell Cladding Cladding with 30 / 60 / 90 / 120mm strips with ESW Small Pipe Cladding Cladding of pipes...

SAW Systems

Single / Twin Wire and Tandem Power Source capacity up to 1600A Single Wire SAW Systems Operating Mode: CC/CV Suitable for SAW, Gouging...
35,768FansLike
76,548SubscribersSubscribe

PRODUCT LAUNCHES